Five-bay hardware shop shelving
1840 × 2070 × 400 mm · 4 bays · White, matt
Cut list produced 06/09/2026 for Yisehak Tilahun · www.medosha.net/designs/five-bay-hardware-shop-shelving-58979
39
Panels
12.391 m²
Board
22.11 m
Banding
1.2
Shop days
4 mm HDF back panel, white4 pieces · 3.629 m² · 2 sheets
| # | Part | Length | Width | Qty | Edge banding | Grain |
|---|---|---|---|---|---|---|
| 1 | Back panel — bay-2 | 1970 | 465 | 2 | — | Any |
| 2 | Back panel — bay-3 | 1970 | 456 | 2 | — | Any |
18 mm chipboard, white melamine35 pieces · 8.762 m² · 4 sheets
| # | Part | Length | Width | Qty | Edge banding | Grain |
|---|---|---|---|---|---|---|
| 3 | Left gable | 1970 | 400 | 2 | Front | Any |
| 4 | Divider 1 | 1934 | 400 | 3 | Front | Any |
| 5 | Bottom | 1804 | 400 | 1 | Front | Any |
| 6 | Top | 1804 | 400 | 1 | Front | Any |
| 7 | Shelf — bay-2 | 438 | 386 | 20 | Front | Any |
| 8 | Zekolo leg | 100 | 50 | 8 | — | Any |
Sheet layout
4 mm HDF back panel, white
2 sheets of 2440 × 1220 mm · 3.629 m² cut from 5.954 m² · 39% offcut
Numbers match the cut list. Cuts run edge to edge in strips, which is how a panel saw works — take the horizontal cuts first, then the vertical ones within each strip. Allow 3.2 mm for the blade.
18 mm chipboard, white melamine
4 sheets of 2440 × 1220 mm · 8.761 m² cut from 11.907 m² · 26% offcut
Numbers match the cut list. Cuts run edge to edge in strips, which is how a panel saw works — take the horizontal cuts first, then the vertical ones within each strip. Allow 3.2 mm for the blade.
Hardware
- Shelf support pin — 20 shelves, four pins each80 each
ETB 16,154 to make plus 25% margin. 0% of it is priced from live supplier listings; the rest is estimated from catalogue rates. This is an estimate produced from a design, not a quotation.
Notes
- · All dimensions in millimetres. Length runs with the grain where the board has one.
- · Sheet counts come from the layout on the following pages, not from an offcut allowance.
- · Scaled proportionally to fit.
Have it made
Send this cut list to a joinery on Medosha and ask what they would charge to build it.